Institutional-Repository, University of Moratuwa.  

Risk management in high voltage power transmissionline construction projects in Sri Lanka

Show simple item record

dc.contributor.advisor Abeynayake, M
dc.contributor.author Priyashanka, RADN
dc.date.accessioned 2025-01-17T03:37:53Z
dc.date.available 2025-01-17T03:37:53Z
dc.date.issued 2024
dc.identifier.citation Priyashanka, R.A.D.N. (2024). Risk management in high voltage power transmissionline construction projects in Sri Lanka [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/23155
dc.identifier.uri http://dl.lib.uom.lk/handle/123/23155
dc.description.abstract Electricity is an essential element in economic growth and socio-economic development of a country. High Voltage Power Transmission Lines (HVPTL) are used to transmit the electric power in bulk from generating stations to substations. HVPTL construction projects are inherently riskier than most of the other types of construction projects. In Sri Lanka the knowledge, practice and application in the particular area is in minimum level. Therefore, this research aims to establish a systematic study on managing risks in HVPTL projects in Sri Lanka, which will ultimately help the project teams to manage risks effectively. The collected empirical data from expert interviews and two rounds of questionnaire surveys were analyzed using content analysis and descriptive statistics respectively. The results of the study initially identified forty-eight (48) risk factors related to HVPTL projects, of which fourteen (14) risk factors were selected as the most significant risk factors. “Delay in project deadline” is the top most critical factor in HVPTL projects according to results. The risk factors are mainly allocated client and contractor or shared between them. The widely used risk response measures and most suitable risk response measures in order to manage those most significant risks were identified. The challenges against following the proper risk management process were checked and it was found out that the “lack of awareness” is at the prime reason. Finally, it is recommended to use more proactive approach in risk management for early identification of risks and for better responses and raise the awareness of stakeholders on the importance of the proper risk management practices. Keywords: High Voltage Power Transmission Lines, Risk Factors, Risk Allocation, Risk Response Measures. en_US
dc.language.iso en en_US
dc.subject RISK RESPONSE MEASURES
dc.subject HIGH VOLTAGE POWER TRANSMISSION LINES
dc.subject RISK FACTORS
dc.subject RISK ALLOCATION
dc.subject PROJECT MANAGEMENT - Dissertation
dc.subject BUILDING ECONOMICS - Dissertation
dc.subject MSc in Project Management
dc.title Risk management in high voltage power transmissionline construction projects in Sri Lanka en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Architecture en_US
dc.identifier.degree MSc in Project Management en_US
dc.identifier.department Department of Building Economics en_US
dc.date.accept 2024
dc.identifier.accno TH5500 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record