Institutional-Repository, University of Moratuwa.  

Barriers to the implementation of concurrent engineering practices within the UK construction industry

Show simple item record

dc.contributor.author Manewa, A
dc.contributor.author Siriwardena, M
dc.contributor.author Ross, A
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Fernando, NG
dc.contributor.editor Karunasena, GI
dc.date.accessioned 2022-03-07T04:27:31Z
dc.date.available 2022-03-07T04:27:31Z
dc.date.issued 2015-06
dc.identifier.citation Manewa, A., Siriwardena, M., & Ross, A. (2015). Barriers to the implementation of concurrent engineering practices within the UK construction industry. In Y.G. Sandanayake, N.G. Fernando & G.I. Karunasena (Eds.), Sustainable development in built environment: green growth & innovative directions (pp. 134-142). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2015-Proceedings.pdf en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/17162
dc.description.abstract Concurrent Engineering (CE) is considered as one of the emerging methods in the UK construction industry. The product and process optimisation through ‘integration’ is a key concern of CE. The integrative aspect is tri-fold, which comprises an integration of product(s), integration of process and most importantly the integration of supply chain. A correct adoption of the concepts and principles of CE into construction practice provides significant benefits to project stakeholders, such as reduced time and costs while improving the quality of products and process efficiency. However, its implementation is not optimised to its full potential within the construction industry. Therefore, this paper aims to identify the key factors that hinder the implementation of CE practices within the UK construction industry. Data were collected from an extensive literature review, observations and semistructured interviews and thematic analysis was adopted to analyse the collected data. The findings indicate that the inability of parties within the construction project settings to communicate effectively is the most significant high level barrier for achieving a wider application of CE practices within the UK construction industry. In total 4 high level barriers, 13 medium level barriers and 38 low level barriers to the implementation of CE with the UK construction practices were identified. The findings of this study will benefit construction organisations, who wish to implement CE practices within their practice. en_US
dc.description.sponsorship International Council for Research and Innovation in Building and Construction (CIB) en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders en_US
dc.relation.uri https://ciobwcs.com/downloads/WCS2015-Proceedings.pdf en_US
dc.subject Barriers en_US
dc.subject Construction engineering en_US
dc.subject Concurrent engineering en_US
dc.subject Construction industry en_US
dc.subject Integration en_US
dc.subject UK en_US
dc.title Barriers to the implementation of concurrent engineering practices within the UK construction industry en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2015 en_US
dc.identifier.conference 4th World Construction Symposium 2015 en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos pp. 134-142 en_US
dc.identifier.proceeding Sustainable development in built environment: green growth & innovative directions en_US
dc.identifier.email [email protected] en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record